Guide
Electrical and plumbing compliance certificates by state and in NZ
Electricians need a certificate for electrical work in New South Wales, Victoria, Queensland and New Zealand. Plumbers need one for all work in New South Wales, and in Victoria for work over $750 and some gas and drain work. In Queensland they register notifiable work with QBCC, and New Zealand gasfitters issue their own. The table has who gets each one and the deadline.
No card, no time limit.
Which certificate, state by state and in New Zealand
| Where | Certificate | For what work | Who gets it | Deadline | Source |
|---|---|---|---|---|---|
| Electricians | |||||
| New South Wales | Certificate of Compliance for Electrical Work (CCEW), lodged in the BCNSW eCert portal | Whenever electrical work has been done | The electrician who did the test lodges it with Building Commission NSW. The portal can email the customer a copy | As soon as practical, and no later than 7 days after the test | nsw.gov.au |
| Victoria | Certificate of Electrical Safety (COES), prescribed or non-prescribed | All electrical installation work. Prescribed work, like consumer mains, main switchboards, solar and batteries, is also inspected by a Licensed Electrical Inspector | The customer and Energy Safe, and for prescribed work the distribution business too | Prescribed: within 16 calendar days of finishing the work. Non-prescribed: within one month | energysafe.vic.gov.au |
| Queensland | Certificate of testing and compliance for installation work, or of testing and safety for work on equipment | Each time an installation you worked on is connected to electricity, and each time you work on electrical equipment | The person who engaged you, usually the one you invoice | As soon as possible after you finish the work | worksafe.qld.gov.au |
| New Zealand | Certificate of compliance (CoC), then an electrical safety certificate (ESC) once the installation is connected | A CoC for general and high-risk prescribed electrical work. Low-risk work, like replacing a fitting, needs no CoC but still gets an ESC | The person who contracted for the work, or the owner or occupier if they aren't readily available | CoC copy within 20 days of finishing. ESC no later than 20 working days after connection, and a copy within 20 working days of issuing it | legislation.govt.nz |
| Plumbers | |||||
| New South Wales | Certificate of Compliance (CoC) | All plumbing and drainage work | Whoever arranged the work, such as the owner or builder. For work that needs an inspection, Building Commission NSW or the local plumbing regulator too | At the completion of the work | nsw.gov.au |
| Victoria | Compliance certificate, lodged through VBA360 | Work over $750, counting materials, appliances, labour and GST, and some work at any value, such as Type A gas appliances, gas piping, below-ground sanitary drains and cooling towers | The customer, and it's lodged with the Building and Plumbing Commission | Within 5 days of finishing the work | bpc.vic.gov.au |
| Queensland | Form 4, registering notifiable work with QBCC | Notifiable work, such as kitchen and bathroom renovations, water heaters, and new or moved toilets, showers, basins and sinks | QBCC, with a copy to the owner or whoever engaged you | Within 10 business days of issuing the invoice | qbcc.qld.gov.au |
| New Zealand, gasfitting | Certificate of compliance (CoC), then a gas safety certificate once the installation is connected | A CoC for general and high-risk gasfitting. Low-risk work, like swapping in an equivalent appliance with no change to pipework, flue, pressure, gas type or ventilation, needs no CoC but still gets a gas safety certificate | The person who contracted for the work, or the owner or occupier if they aren't readily available | Gas safety certificate no later than 20 working days after connection, and a copy within 20 working days of issuing it | legislation.govt.nz |
| New Zealand, plumbing and drainlaying | Code compliance certificate from the council for consented work. Since 30 June 2026, for self-certifiable work, a self-certification endorsed plumber or drainlayer can issue a certificate of compliance the council must accept, when the consent application relied on it | Work under a building consent. An authorised plumber needs no consent for repairs, maintenance, same-place replacement with comparable products, or replacing a water heater whose heat sources are all controlled | The owner applies to the council for the code compliance certificate | Owner applies as soon as practicable after all the consented work is finished | legislation.govt.nz |
Before you start, on small jobs, and after
- New South Wales, electrical: Like-for-like swaps need a CCEW too, including water heaters, ovens, stove tops and electrical accessories. nsw.gov.au
- New South Wales, solar and batteries: From November 2026, new and upgraded rooftop solar, battery and inverter systems up to 200 kW are commissioned through the NSW CER Installer Portal, which sends the CCEW for you. Other electrical work on the same job still needs its own CCEW. nsw.gov.au
- New South Wales, plumbing: Submit a Notice of Work before you start work that needs an inspection. Emergency work and minor works, like replacing tapware or an existing hot water system, don't need one. For work with no inspection, the Combined Notice of Work and Certificate of Compliance can be used. nsw.gov.au
- Victoria, electrical: Prescribed work can't be turned on, or left on, until it's been inspected. energysafe.vic.gov.au
- Victoria, single parts: Replacing one component with an equivalent part in the same place, like one circuit breaker, isn't prescribed work, but it still needs a non-prescribed COES. energysafe.vic.gov.au
- Queensland, plumbing: Permit work, like plumbing for a new building, needs a Form 1 permit application to the local government before you start. Minor work, like clearing a blockage or repairing a broken pipe, needs no approval and isn't reported to QBCC. qbcc.qld.gov.au
- Queensland, the Form 4 copy: Send the customer or occupier a copy within 20 business days after the work is finished. qbcc.qld.gov.au
- New Zealand, high-risk electrical work: High-risk electrical work, like installing solar, must be inspected, and the inspector lodges it on WorkSafe's database within 20 working days of the record of inspection. legislation.govt.nz
- New Zealand, high-risk gasfitting: Whoever issued the CoC lodges its details on WorkSafe's database within 20 working days of issuing it. legislation.govt.nz
Keep the certificate with the job
Tradies Line AI keeps each job's photos and documents with the job, so the certificate PDF is on hand when someone asks for it. Its AI receptionist answers the calls you miss and books the next job.
Questions
Can a plumber sign off their own work in New Zealand?
Since 30 June 2026, yes, for self-certifiable work, if they hold a self-certification endorsement. The owner names them on the building consent application, and the council must accept their certificate of compliance as showing the work complies with the consent. Without it, the council can refuse the code compliance certificate for that work.
Can I hold back the certificate until the customer pays?
Energy Safe Victoria says an electrician can't refuse to issue a Certificate of Electrical Safety for any reason, payment issues and contract disputes included. Building Commission NSW says a plumber who hasn't been paid must still give the client the Certificate of Compliance and Sewer Service Diagram (nsw.gov.au).
Can my invoice be the certificate?
In Queensland, for electrical work, yes. WorkSafe Queensland says the invoice can act as the certificate if it carries everything the regulation asks for: the customer's name and address, what you tested, the day you tested it, your electrical contractor licence number and the certification statement. Keep a copy for at least five years.
Does a like-for-like swap need a CCEW in New South Wales?
Yes. Building Commission NSW says a CCEW is needed for any electrical work that installs, repairs, adds to or alters electrical equipment, including like-for-like replacement of water heaters, ovens, stove tops and electrical accessories.
Do solar and battery jobs in New South Wales need a separate CCEW?
No. From November 2026, new and upgraded rooftop solar, battery and inverter systems up to 200 kW are commissioned through the NSW CER Installer Portal, which sends the CCEW to Building Commission NSW. Any other electrical work on the same job still needs its own CCEW in BCNSW eCert.
Who gets the certificate when I work for a builder?
Whoever engaged you. In Queensland, the electrical certificate goes to the builder unless the owner engaged you directly. In New South Wales, the plumbing Certificate of Compliance goes to the person who arranged the work, the owner or the builder.
How long do I keep my copy?
Five years for electrical certificates in Queensland, three years for a Certificate of Electrical Safety in Victoria, and at least seven years for electrical and gas certificates of compliance and safety certificates in New Zealand.
Checked against each regulator's page on 7 November 2026, except the Building and Plumbing Commission and WorkSafe Queensland pages, last read on 6 October 2026. New Zealand rules are from the regulations and the Building Act on legislation.govt.nz. This is general information, not legal advice: check with the regulator in your state, or in New Zealand with WorkSafe for electrical and gas work and your council for consented plumbing and drainlaying, before you sign off the job. For what an invoice must show, see the electrician invoice template and the plumbing invoice template.
Ready to hand the office over?
Jobs, quotes, invoices and every customer message in one place, with Wombo doing the admin while you're on the tools.
Start freeNo card, no time limit.